At a glance
Key Takeaways
- Association approval and a building permit are separate processes; one does not replace the other.
- A useful submission can include product, color, style, housing and track locations, drawings or specifications, photos and opening dimensions.
- Total Shutter Technologies can prepare color-matching information, renderings and product specifications for the submission.
- Ask about condominium common-property review and the association's preferred submission procedure.
- Approval is not guaranteed; request written standards and discuss alternatives if a proposed option is not accepted.
Planning hurricane shutters or motorized screens in a Florida community can involve two different reviews: the association's architectural approval and the building permit process. They may ask for overlapping product information, but they have different purposes and should be handled as separate steps.
A clear submission gives reviewers enough detail to understand the product and how it will look on the home. Association standards and procedures differ, so confirm the requirements for your property rather than relying on another homeowner's experience.
Association approval is not a building permit
An HOA or condominium association may review appearance, placement and project documents under its governing process. A building permit addresses construction work under the applicable permitting requirements. Association approval does not replace a permit, and a permit does not mean the association has approved the appearance or proposal.
Treat the reviews as distinct tasks and ask what is required for each. The association may have an application, submission format or review procedure. The permitting authority has its own requirements and review. Total Shutter Technologies handles permit coordination for its work; the homeowner should still confirm and follow the association's process.
Florida law gives hurricane shutters special treatment in some association rules. The details depend on the applicable documents and circumstances. Check your governing documents and consult your association about how its rules apply; this general explanation is not legal advice and does not establish that a particular product or request will be approved.
What to gather for an architectural submission
Before starting an application, ask the association which materials it expects and whether it has a form or preferred file format. A complete, legible package reduces avoidable back-and-forth and gives reviewers a clearer picture of what is proposed. The exact list is set by the association, so confirm it directly.
- Product style and system name, with specifications for the proposed product.
- Color selection and available color-matching information.
- The proposed location of tracks and housing, with drawings or renderings where useful.
- Photos of the existing opening and the area where the system will be placed.
- Opening dimensions and any relevant project drawings.
Make the proposed appearance easy to understand
A reviewer may need to see more than a product name. Show where visible housing and tracks would sit, identify the proposed color and provide specifications that distinguish the selected system from a general product category. Photos and a rendering can help communicate the relationship between the proposed work and the existing exterior.
Total Shutter Technologies can prepare color-matching information, renderings and product specifications for the association submission. Ask what the association needs before the package is assembled so that the information is relevant to its review. The company can explain the product scope, but the association makes its own decision.
A practical order for the work
Start by obtaining the association's written submission requirements and identifying any property-specific restrictions. Discuss the opening, product and finish with the contractor, then assemble the requested drawings, specifications, photos and dimensions. Submit the package through the association's required process and keep a copy of what was sent.
The planning order is association approval, then the building permit, then installation. Wait for the association's response before treating the appearance review as complete, and confirm permit requirements and scope with the contractor. After the required approvals are in place, installation can be planned. This sequence is a planning aid, not a promise of a review or permit timeline.
If the property is a condominium, ask whether the proposed area or attachment involves common property or another association-controlled element. The association may require additional review or coordination. Do not assume that an exterior opening is solely within an owner's control; get the association's direction in writing.
Timeline tips: submit early
Submit early enough to address questions before you need the project to move forward. Ask how the association accepts applications and when it reviews them, then confirm that your package has reached the right person. Do not assume an association review follows the same schedule as a building permit.
If the association requests a revised drawing, color choice or specification, keep the updated version with the rest of the submission. Share its written response with the contractor so the permitted and installed work can reflect the accepted project. Submit early rather than relying on a promised approval date.
If the association asks for more information or says no
A request for clarification is a chance to make the package more precise. Ask which part is missing or unclear: product specifications, finish, visible placement, dimensions or supporting images. Respond to the actual request rather than sending unrelated material. Keep your correspondence and any updated drawings together.
If the association does not approve the first proposal, ask for the applicable written standards and the reason for the decision. Share that feedback with the contractor and ask whether there are product or color alternatives that address the stated concern. An alternative can be discussed, but approval should never be represented as guaranteed.
Keep the association discussion separate from the permit discussion. A product or color change may require the submission to be updated, while permit documentation has its own requirements. Confirm any revised scope before it is ordered or installed.
Planning for local homes and communities
Community requirements vary across Florida. Whether a home is in Sarasota, Lakewood Ranch, Longboat Key or another area, the most reliable starting point is the written process that applies to that property. Generic local guidance cannot replace the community's own standards or the applicable permitting review.
Total Shutter Technologies works with homeowners on shutter and screen projects and can help prepare product information for an association submission. A free on-site estimate can clarify the proposed system and opening details. Ask for the scope and any supporting documents you need, and keep association approval and permitting status clear in your project records.
Good to know
Frequently Asked Questions
Does HOA approval replace a building permit?
No. Association approval and a building permit are separate processes with different purposes. Confirm both the association's submission requirements and the applicable permitting requirements.
What should I submit to my association?
Ask for its written requirements. A submission may include the product style and specifications, color, housing and track locations, drawings or renderings, photos and opening dimensions.
Can an association deny my shutter or screen request?
Approval is not guaranteed. Ask for the applicable written standards and the reason for the decision, then discuss possible alternatives with the contractor and consult your association about its process.